Skip to content

Insights

Rush order, and the machine breaks down! Taming downtime with ERP

blog

“A big order is being rushed through to make tomorrow morning’s sailing, when suddenly the main machine at the heart of the line lets out a deafening bang and just stops!… Production is up in arms, the maintenance techs race over to strip the machine down, only to discover that ‘the part that broke isn’t in stock!’ In the end, the line is down for three full days.”

If this scene is all too familiar and keeps playing out in your factory, your organization is stuck in the trap of “fix it when it breaks” maintenance (run-to-failure, or breakdown maintenance), the most expensive strategy there is and the one that does the most damage to a manufacturer’s profits.

Production teams often see stopping a machine for cleaning or a scheduled oil change as “lost production time,” so they keep pushing maintenance back to hit their output targets. But did you know that running a machine past its limits until it breaks down on you brings hidden costs dozens of times higher than a planned stop?

The downtime disaster when Production and Maintenance “speak different languages”

Running maintenance on paper, or letting each department keep its own records, opens up some major leaks:

  • Lost production capacity (capacity loss): A one-hour unplanned stop can mean tens of thousands of units of lost output, while dozens of line workers stand around being paid for no work.
  • Capital tied up in spare parts (the spare parts nightmare): Because nobody knows when a machine will fail, Purchasing’s solution is to “buy every part and stockpile it,” locking up capital in spare parts that never get used. Or the reverse happens: when a machine really does break down, that one part is out of stock and you have to pay a premium for a rush order.
  • Shorter machine life (asset depreciation): Letting worn components grind along spreads the damage to other parts. A repair that should have cost no more than a bearing can end up costing a million baht or more for a whole new motor.

Turn a “dead weight” into a “profit driver” with the PM module in your ERP

Bridging the gap between Production and Maintenance takes a central system that gives everyone the same set of data. Fully integrating preventive maintenance (PM) with an ERP (Enterprise Resource Planning) system is the most sustainable solution, through the following mechanisms:

1. Maintenance alerts based on actual usage (usage-based triggers)

Forget counting maintenance days on a paper calendar! The ERP can pull data from the shop floor to record “actual running hours” or “production cycle counts.” When a machine approaches its set threshold (for example, 5,000 hours), the system raises a work order in advance and sends it straight to the engineering team, so maintenance can be planned before the machine breaks down.

2. Keep maintenance slots from clashing with production (production and maintenance sync)

This is the feature that ends the tug-of-war! When the ERP schedules a maintenance job, it immediately “blocks” that machine’s time in the production planning system, so planners can’t assign work to the day and time the machine is due for PM. The maintenance team gets the time it needs to do the job properly, without pressure from Production.

3. Reserve spare parts in advance and eliminate shortages (automatic spare parts allocation)

As soon as a PM work order is created, the ERP checks the warehouse to see whether the parts required (such as belts, filters, or lubricants) are available in sufficient quantity. If stock is running low, the system automatically prompts Purchasing to reorder ahead of time. That way, when maintenance day arrives, the technicians have every tool and part they need and can get straight to work.

Summary: the most cost-effective maintenance is fixing things before they break

In manufacturing, “machine reliability” is a competitive advantage. Investing in an ERP to manage your preventive maintenance (PM) schedule doesn’t add to the workload. It buys you “peace of mind” that your production line will keep running, with fewer bottlenecks, fewer emergency parts orders, and deliveries that always reach customers on time.

References

  • Mobley, R. K. (2002). An Introduction to Predictive Maintenance. Butterworth-Heinemann. (Cited for the theory distinguishing run-to-failure maintenance from preventive maintenance, and its impact on a plant’s total costs.)
  • Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Productivity Press. (Cited for the principles of total productive maintenance (TPM), reducing the six big losses of equipment, and improving overall equipment effectiveness (OEE).)

Back to all articles