Parts Go Missing Every Time You Subcontract? Plug the Subcontracting Leaks with ERP

blog

“We sent 10,000 steel parts to a subcontractor for anti-rust plating, but on the delivery date only 9,500 came back… So where did the other 500 go? Were they scrapped during processing, or did the subcontractor quietly keep them? And who pays for the lost material?”

If your factory relies on outsourced manufacturing, whether that’s sending parts out for plating, painting, or contract assembly, you probably know this kind of chaos all too well.

The moment goods leave your factory gates, you lose control over both quality and stock quantities. Many factories try to work around this by having Purchasing raise separate subcontracting POs while Production logs outgoing and incoming quantities in Excel. The result: data that never quite lines up, Accounting wrestling with complicated invoices, and worst of all, “hidden costs” from lost goods that the factory quietly absorbs itself.

Flying Blind: When You Can’t See Stock Outside Your Factory

Managing subcontracted work manually, or with software that wasn’t designed for manufacturing, causes losses on 3 main fronts:

  • Untraceable material losses (lost in transit and in process): When you send material out and fewer finished parts come back, without a system that applies the agreed scrap rate, the factory has no way to tell whether the shortfall is within an acceptable allowance or whether you’re being cheated.
  • Inaccurate costing: Subcontracting fees, transport fuel, and the cost of lost material are often booked by Accounting as “general overhead,” when they should really be added to the “direct cost” of that specific product lot. The result is mispriced products.
  • Production delays: When the planner doesn’t know when subcontracted parts will come back, they can’t schedule the next work center to be ready for them, which creates bottlenecks and late deliveries to customers.

Extend Your Control Beyond the Factory Gates with ERP

An industrial-grade ERP (Enterprise Resource Planning) system includes a subcontracting management function that works like putting CCTV in your partner’s warehouse, plugging every leak through the following process:

1. Control Off-Site Inventory (External WIP Tracking)

The ERP sets up a “virtual warehouse” for each subcontractor in the system. When you send parts out, the system doesn’t write the stock off. Instead, it “transfers” it to the partner’s location, so management can pull up a real-time report showing exactly how much of your material, and its value, is sitting in the queue at the plating shop.

2. Automatically Roll Subcontracting Fees into Production Cost (Automated Cost Roll-up)

No more Accounting staff averaging out subcontracting fees by hand! When finished parts are received back, the ERP adds the “original material value” to the “service fee” on that subcontractor’s purchase order (PO), and instantly converts the result into semi-finished WIP carrying an accurate cost.

3. Reconcile Materials and Account for Every Lost Piece (Material Reconciliation)

This is the anti-fraud feature! When the partner returns the goods, the ERP immediately checks them against the bill of materials (BOM). If you sent out 10,000 pieces and only 9,500 came back, the system clearly flags a variance of 500 pieces. You can configure it to either write those 500 pieces off as scrap or automatically issue a debit note charging the subcontractor for the loss.

Conclusion: Take Control of Your Partners and Close Every Leak

Subcontracting is a smart way to take load off your own machines, but without a system that tracks and reconciles materials rigorously, it simply opens the door for profit to flow out of the factory. Investing in an ERP to manage subcontracting eliminates blind spots in your supply chain, so you know the status of every part, control costs down to the last baht, and deliver to customers on time, every time.

Do you know, right now, how many hundreds of thousands of baht of your material are sitting at a subcontractor’s plant, and whether you’re really getting full value back? Talk to our manufacturing ERP specialists today and put a professional control structure in place for your subcontracting process!

Theoretical References

  • Krajewski, L. J., Malhotra, M. K., & Ritzman, L. P. (2015). Operations Management: Processes and Supply Chains. Pearson. (Cited for supply chain management theory, outsourcing/subcontracting of production, and its impact on inventory control and capacity planning.)
  • Heizer, J., Render, B., & Munson, C. (2016). Operations Management: Sustainability and Supply Chain Management. Pearson. (Cited for supply chain costing principles, traceability of materials outside the organization, and managing the risks of supplier dependence.)